SYSTEM INTEGRATION

LMOT OSP PROJECT –Phase 6– BEIRUT Area (Capmor)

Supply and installation of all of the physical cabling, and any associated hardware (such as Cabinets, Distribution Panels, Joints…) located between two demarcation points in a switching facility and customer premises.

LMOT OSP PROJECT –Phase 6– MOUNT LEBANON & NORTH Areas (Caporal & Moretti)

Supply and installation of all of the physical cabling and supporting infrastructure (such as trenches, conduits, cabinets, tower or poles), and any associated hardware (such as Cabinets, Distribution Panels, Joints…) located between two demarcation points in a switching facility and customer premises.

OGERO DSL ROOMS (Caporal & Moretti)

Supply and installation of electrical generators with environmental works and all electrical works including but not limited to Synchronization and ATS Panel Boards, electrical distribution Panels, cabling works, lighting , power outlets, Data/Telephone Distribution network, Fire Alarm System…

BANK DU LIBAN (BDL) – HEADQUARTERS DATA CENTER (SITI) ( Caporal & Moretti)

Installation and commissioning of the first Cat.7 structured cabling project in Lebanon for the Data Center (SITI) of the BDL. Over 1000 Cat.7 and 1600 fiber optic nodes along with other related system like Access control and environmental monitoring. Supply and installation of all electrical works including but not limited to all Panel boards, cabling works, lighting , power outlets, Data/Telephone Distribution network, Fire Alarm System, CCTV system, earthing and lightning protection system.

 

  • OSP Works

Data Centers

3 Photos